The division's responsibility is to plan, organize and direct the operation of its five sections. These sections are:
Street Maintenance (Signs/Sweeping)
Street Paving
Sidewalk Repair/Replacement
Street Lighting
Traffic Control
Electrical
Communications
Responsibilities
Managing the construction, repair and maintenance of City roads, bridges and storm drainage facilities
Installation and repair of electrical systems traffic signal systems, street lights, signs and markings
Managing the design, acquisition, installation, operation, maintenance, repair and replacement of City-wide radio
Assisting in the development and control of the division budgets
Facilities Maintained by this Division
The Public Works Maintenance Division is responsible for the maintenance of approximately 480 lane miles of public roadway and right-of-way. Facilities that the division maintains include:
ADA ramps
Bicycle lanes
Curb and gutter
Pavement markings
Sidewalks
Storm drainage
Street lights
Street pavement
Traffic signals
Traffic signs
Various maintenance programs have been implemented which fully maximize the use of the division's 37 full-time Maintenance Workers. A management team is responsible for the day-to-day operations, as well as for short and long range planning.
Sidewalk Repair Program
The Sidewalk Repair Program was enacted by City Council in 1990 for expedient repair of frontage improvements damaged by street trees throughout the City. The program allows property owners to replace street trees, sidewalk, curb, gutter, and driveway and receive a partial reimbursement from the City. The program is funded yearly by the General Fund.
If you have questions about the Sidewalk Repair Program, please contact us.