Skip to Main Content
Loading
Loading
Search
Government
Services
Residents
Business
How Do I...
Home
Form Center
Form Center
Search Forms:
Search Forms
Select a Category
All Categories
ARPA Community Recovery Bank
City Clerk
City Manager
Code Enforcement Division
Economic Development
Finance
Fire
Homelessness Services
Horizontal Street Banner Application
Human Resources
Napa Police Community Engagement Meeting Questions
Parks and Recreation
Police Department
Police Department - Neighborhood Contact Forms
Public Safety & City Hall Facilities Project
Public Works Forms
Recycling and Solid Waste Division
Risk Management
Utilities
Water Division
By
signing in or creating an account
, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.
Draft 3 Waste Reduction and Recycling Plan (WRRP)
Sign in to Save Progress
This form has been modified since it was saved. Please review all fields before submitting.
Steps
1.
Page 1
This section is complete
This section is incomplete
2.
Page 2
This section is complete
This section is incomplete
3.
Page 3
This section is complete
This section is incomplete
4.
Page 4
This section is complete
This section is incomplete
Page 1
WASTE REDUCTION AND RECYLCING PLAN (WRRP)
The City of Napa has adopted a construction and demolition (C&D) debris recycling ordinance to redirect C&D materials away from the landfills (Napa Municipal Code, Chapter 15.32). The ordinance requires that 100% of “designated” materials be site-separated on site and recycled. In addition, for projects that exceed $100,000 or 5,000 square feet (“covered projects”), the project must achieve a minimum overall salvage or recycle rate of 50% of all C&D debris generated, and a Waste Reduction and Recycling Plan (WRRP) must be submitted and approved before a building or demolition permit can be issued. Noncompliance with a WRRP plan may result in a fine ranging from 1% to 5% of project valuation.
For more information, please see the Frequently Asked Questions document under the Construction and Demolition Debris Recycling heading at www.cityofnapa.org/recycle.
Please complete the following form for construction and demolition materials produced as a result of work performed in the City of Napa. The City of Napa’s Materials Diversion (Recycling) Division can provide limited assistance to applicants in developing and implementing a WRRP. Should you have any questions regarding this form or the C&D Waste Recycling Program, please call the City of Napa Materials Diversion (Recycling) Division at (707) 257-9326. For covered projects, a $300 one-time, non-refundable administration fee will be due at time permit fees are paid.
Please submit your completed and signed WRRP form to:
City of Napa, Attn: Construction and Demolition Debris WRRP Submittals P.O. Box 660, Napa, Ca 94559-0660 EMAIL signed PDF to:
[email protected]
napa.org
1. Project & Applicant Info
Project Address
Date
Date
Applicant's Name
Applicant's Email
Phone Number
Contractor's Name
Contractor's Email
Contractor's Phone #
Estimated Demolition Start Date:
Estimated Demolition Start Date:
Estimated Demolition End Date:
Estimated Demolition End Date:
Estimated Construction Start Date:
Estimated Construction Start Date:
Estimated Construction End Date:
Estimated Construction End Date:
Building Permit #:
Brief Description of Project:
Project Sq. Footage:
Continue
Page 2
Material Handling Estimate Worksheet
Fill in the boxes below and add up all material quantities for each column. Calculate the estimated diversion percentage in the section at the bottom of this worksheet and enter the percentage on page 2, line 4a. of this form.
Recyclable Materials
Column A
Column B
Column C
Material Type
Appliances & Equipment
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Asphalt/Concrete
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Brick/Masonry/Tile
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Cardboard
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Carpet/Padding
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Deconstructed/Salvage
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Drywall (unpainted/scraps)
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Landscape Debris
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Scrap Metal
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Wood, Clean (unpainted, untreated)
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Disposal Material
Column A
Column B
Column C
Material Type
Wood (painted or treated)
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
C & D Materials
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Garbage/trash
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Material Type
Recycled Quanity
Disposal Quanity
Total Quanity
Destination Facility Name and Location:
Waste Diversion Calculation Estimate:
Insert diversion percentage on page 2, number 4a.
Divide Column A by Column C = Total Diversion
*
Column A - Recycled Total:
Column B - Disposal Total:
Column C - Overall Total:
Continue
|
Go Back
Page 3
2. DESCRIPTION OF DIVERSION PLAN
Briefly state how waste materials will be handled at your job site to ensure salvage/reuse or recycling. Also explain how you will inform your workers/sub-contractors of your Waste Reduction and Recycling Plan requirements and ensure their participation, including site separation of “designated” recyclable materials.
*
3. INFEASIBILITY EXEMPTION
Please fill out the section below if you believe that your project is entitled to an exemption and not required to divert or recycle C&D debris. If you feel you are unable to recycle materials from the designated recyclable materials list specified in the Ordinance (Napa Municipal Code, Chapter 15.32), please note why (e.g. asbestos debris). If you feel you are unable to meet the diversion requirements of the Ordinance, please explain why and propose a diversion rate which you believe is feasible for your project.
*
4. MATERIAL HANDLING ESTIMATE
Please complete the worksheet on the following page that will help identify the types of materials, estimated quantities, and how the waste material will be reduced, recycled or disposed at your project site. Estimates should be calculated in tons.
Print Name:
Date:
Date:
Electronic Signature Agreement
By checking the "I agree" box below, you agree and acknowledge that 1) your application will not be signed in the sense of a traditional paper document, 2) by signing in this alternate manner, you authorize your electronic signature to be valid and binding upon you to the same force and effect as a handwritten signature, and 3) you may still be required to provide a traditional signature at a later date.
I agree.
Electronic Signature
Continue
|
Go Back
Page 4
MATERIALS VOLUME-TO-WEIGHT CONVERSION WORKSHEET
This worksheet lists materials typically generated from a construction or demolition project and provides formulas for converting common units (i.e. cubic yards, square feet and board feet) to tons. If you use volume to weigh conversion to estimate tonnage, it is required that you use the conversion rates established below:
Material Type
Appliances/Equipment Asphalt/Concrete Brick/Masonry/Tile Cardboard . Carpet/Padding/Foam Deconstructed/Salvage Dirt.................................... Drywall (unpainted) Landscape Debris......... Scrap Metal ............ Wood unpainted...…. Wood treated/painted... C&D Materials Garbage/Trash
Volume/Unit
___________ cy X ___________ cy X ___________ cy X ___________ cy X ___________ sq ft X ___________ X ___________ cy X ___________ cy X ___________ cy X ___________ cy X ___________ cy X ___________ cy X ___________ cy X ___________ cy X
Unit Conversion
______.17______= ______0.8______= ______.70______= ______.05______= ______.10______= ______.15______= ______.75______= ____.00105_____= ______.15______= ______.50______= ______.15______= ______.15______= ______.15______= ______.175_____=
Resulting Tons
___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________ ___________________
Leave This Blank:
Receive an email copy of this form.
Email address
This field is not part of the form submission.
Submit
|
Go Back
* indicates a required field
Agendas & Minutes
Pay Your Water Bill Online
Employment
Permits & Licenses
Recreation Activities
Report a Problem
Government Websites by
CivicPlus®
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow