Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Waste Reduction and Recycling Plan (WRRP) Fillable Form

  1. WASTE REDUCTION AND RECYLCING PLAN (WRRP)
    The City of Napa has adopted a construction and demolition (C&D) debris recycling ordinance to redirect C&D materials away from the landfills (Napa Municipal Code, Chapter 15.32). The ordinance requires that 100% of “designated” materials be site-separated on site and recycled. In addition, for projects that exceed $100,000 or 5,000 square feet (“covered projects”), the project must achieve a minimum overall salvage or recycle rate of 50% of all C&D debris generated, and a Waste Reduction and Recycling Plan (WRRP) must be submitted and approved before a building or demolition permit can be issued. Noncompliance with a WRRP plan may result in a fine ranging from 1% to 5% of project valuation.
  2. For more information, please see the Frequently Asked Questions document under the Construction and Demolition Debris Recycling heading at www.cityofnapa.org/recycle.
    Please complete the following form for construction and demolition materials produced as a result of work performed in the City of Napa. The City of Napa’s Materials Diversion (Recycling) Division can provide limited assistance to applicants in developing and implementing a WRRP. Should you have any questions regarding this form or the C&D Waste Recycling Program, please call the City of Napa Materials Diversion (Recycling) Division at (707) 257-9326. For covered projects, a $300 one-time, non-refundable administration fee will be due at time permit fees are paid.
  3. Please download and submit completed form to:
    City of Napa, Attn: Construction and Demolition Debris WRRP Submittals P.O. Box 660, Napa, Ca 94559-0660 EMAIL signed PDF to: [email protected]
  4. 1. Project & Applicant Info
  5. Instructions to save and upload document.
    Once the fillable form is complete, right-click and select print. Once the print screen opens, change the printer name to (Print to PDF) click - OK. When the save print output as menu opens; click on desktop, under file name (type in project address), Click save. Now the form has been saved to your desktop and is ready to be uploaded.
  6. Please upload completed form.
  7. 5. VERIFICATION
    “I understand the legal requirements associated with the City’s construction and demolition debris ordinance and that all weight-based documentation (such as certified weight tags) must be supplied at the conclusion of the project to demonstrate compliance with approved plan. To the best of my knowledge, the tonnage and diversion percentage estimates reported on this form are my best estimate of the disposition of the construction and demolition materials generated at this project site. Any material deviation from an approved plan during the project will be communicated with City officials to ensure compliance will be maintained.”
  8. Electronic Signature Agreement
    By checking the "I agree" box below, you agree and acknowledge that 1) your application will not be signed in the sense of a traditional paper document, 2) by signing in this alternate manner, you authorize your electronic signature to be valid and binding upon you to the same force and effect as a handwritten signature, and 3) you may still be required to provide a traditional signature at a later date.
  9. Leave This Blank:

  10. This field is not part of the form submission.