engineering main street 2

The Engineering Division leads the development and implementation of the City’s 5-year Capital Improvement Program.  The Division performs the design of Capital Improvement Project infrastructure, excluding water projects which are handled by the Water Division. The Engineering Division provides design management to other Departments and Divisions on an as-needed basis.  The Division also manages on-call civil engineering and land surveying contracts.

Current Capital Improvement Projects include:

  • Big Ranch Road Widening
  • China Point Overlook
  • Napa River Dredging