Phase 3 Response Area

Area Details

"Moderate River Flooding" begins when the Napa River reaches the level of 28 feet at Oak Knoll, and this flooding affects the Phase 3 area. If the River is flooding the Phase 3 area, it is likely that the Phase 1 and Phase 2 areas are also being flooded. When the Phase 3 area is threatened, the following streets will be closed:

  • Action Avenue
  • Adrian Street (Between Jackson and South End)
  • Bale Street
  • Carolina Street
  • Clay Street (Between Juarez and Silverado Trail)
  • First Street (Between Juarez and Silverado Trail)
  • Garden Court
  • Hagen Road at Silverado Trail
  • Ida Street
  • Iroquois Street (Between Jackson and Lincoln)
  • Jackson Street (Between Main and Yajome)
  • Juarez Street
  • Lincoln Avenue (Between Iroquois and Silverado Trail)
  • Maplewood Avenue
  • Second Street (Between Juarez and Silverado Trail)
  • Silverado Trail (Between Monticello and Stonecrest, and between Fairview Drive and Sousa Lane)
  • Soscol Avenue (Between Central and Lincoln, and (Between Sousa Lane and Silverado Trail)
  • Sousa Lane
  • Streblow Drive from the gate to the end of the road
  • Taylor Street (Between Juarez and Silverado Trail)
  • Third Street (Between Juarez and Silverado Trail)
  • Yajome Street (Between Jackson and Yount)