Standard Specifications
Water-Related Public Works Standard Plans and Specifications
Please contact the Water Division office at 707-257-9521 with any additional questions.
- Combined Water Standards
- W-01 - 0.75-in and 1-in Water Service
- W-02A - 1.5-in Water Service
- W-02B - 2-in Water Service
- W-03A - 3-in Water Service
- W-03B - 4-in Water Service
- W-03C - 6-in Water Service
- W-04A - 2-in Fire Service
- W-04B - 4-in and Larger Fire Services
- W-04C - 6-in and Larger Fire Service with Meter
- W-05A - DCV for .75-in and 1-in Residential Services
- W-05B - DCV for 1.5-in and 2-in Residential Services
- W-05C - DCV (Exterior) for 3-in to 8-in Residential Services
- W-05D - DCV (Interior) for 3-in to 8-in Residential Services
- W-06A - RP (Exterior) for .75-in to 2-in Commercial Services
- W-06B - RP (Interior) for .75-in to 2-in Commercial Services
- W-06C - RP (Exterior) for 3-in to 8-in Commercial Services
- W-06D - RP (Interior) for 3-in to 8-in Commercial Services
- W-07A - DCV (Exterior) for 2-in Fire Services
- W-07B - DCV (Interior) for 2-in Fire Services
- W-07C - DCV (Exterior) for 4-in to 8-in Fire Services
- W-07D - DCV (Interior) for 4-in to 8-in Fire Services
- W-08 - Fire Hydrant
- W-09 - Valves
- W-10A - 2-in Blow-Off Assembly
- W-10B - 2-in Blow Off (TOP)
- W-10C - Transmission Valve_Blowoff_Bypass
- W-10D - Water Sampling Station
- W-10E - Motorized Transmission Valve_Blowoff_Bypass
- W-11A - 1-in Air Release and Vacuum Valve
- W-11B - 2-in Air Release and Vacuum Valve
- W-12 - General Water Notes
- W-13A - Water Trench Detail
- W-13B - DOT Water Main Casing
- W-14A - Thrust Block and Wingwalls
- W-14B - Water Main Restraint Details
- W-14C - Typical System Restraint Lengths
- W-15 - Water Main Offsets
- W-16A - Hot-Tap Detail
- W-16B - Tie-In
- W-17 - Abandonment of Existing Water Facilities
- W-18 - Water Facility Obstruction Separation Requirements
- W-19 - Future Water Main Extension Stub
- W-20A - Water Service Responsibility
- W-20B - Water Service Responsibility (Unmetered Service)
- W-21 - Installation of Fire Hydrant Pavement Markers
- W-22A - Horizontal Separation Requirements from Utilities
- W-22B - Vertical Separation Requirements from Utilities
- W-23A - Pipe Connectivity
- W-23B - Exothermic Weld
- W-23C - Bond Cables
- W-23D - Cable Splice
- W-24A - Anode Installation
- W-24B - Anode Installation (Fitting)
- W-24C - Anode Installation (Vertical Offset)
- W-24D - Anode Installation (Leak Clamp)
- W-24E - Anode Installation - Drivable Magnesium Anodes
- W-25A - Insulating Joint
- W-25B - Insulating Joint Coating
- W-26A - Test Station and Terminal Box
- W-26B - Anode Test Station (Existing Pipe)
- W-26C - Test Station Cable Identification
- W-27A - Test Station (Corrosion)
- W-27B - Test Station (Foreign Pipeline)
- W-28A - Anode Test Station (DIP)
- W-28B - Anode Test Station (Fire Hydrant)
- W-28C - Anode Test Station (Valve)
- W-28D - Anode Test Station (Cross)
- W-28E - Anode Test Station (Casing)
- Water Distribution Design Provisions